On April 15, 2016, the logistics facility built by the consortium of TARCON Sp. z o.o. and TARCON-INVEST Sp. z o.o. Sp. k. for Małopolski Park Logistyki (Małopolski Logistics Park) served as the venue for the ceremony to celebrat
Tarcon won a contract for the design of the 2nd stage of the Małopolski Park Logistyczny (Małopolski Logistics Park) in Targowisko.
Małopolskie Centrum Logistyczne Targowisko (Małopolskie Logistics Centre Targowisko) built for Zasada Trans Spedition Sp. z o.o. Sp. k. and handed over for use within 30 weeks.
The consortium of Tarcon and Tarcon Invest started the construction works to expand the production facility in Myślenice for Cooper Standard Polska Sp. z o.o.. A production and storage hall with the floor area of more than 10,000
Tarcon has begun the construction of a service hall at Fabryka Opakowań Blaszanych [Sheet Metal Package Factory] in Bydgoszcz at ul. Kobaltowa. A production hall with the floor area of about 3,600 m2, equipped with the technical i